View Single Post
  #6 (permalink)  
Old 16-05-2007, 03:25 PM
MotherBear's Avatar
MotherBear MotherBear is offline
The missing link


Points: 29,055, Level: 100
Points: 29,055, Level: 100 Points: 29,055, Level: 100 Points: 29,055, Level: 100
Level up: 2%, 0 Points needed
Level up: 2% Level up: 2% Level up: 2%
Activity: 100%
Activity: 100% Activity: 100% Activity: 100%
Join Date: Jan 2005
Location: Oman ex Wales, UK
Posts: 8,151
Blog Entries: 1
MotherBear will become famous soon enough
Default

It?s a start.

Go-ahead for wind farm
5:30AM Wednesday May 16, 2007

The Environment Court has given the go-ahead for a wind farm at Makara near Wellington but has decided the number of turbines should be reduced.

The court says Meridian Energy should be allowed to build a 66-turbine windfarm, a cut of four from the 70 the company received consent for in 2005.

From here .

Vector backing windfarms .
__________________
Mother Bear
Reply With Quote